During our March TrueView Training event, we recorded the training session with the presenter to have the training material available on demand. Since the training covers two days of various topics we have broken the event down into smaller pieces. This first session covers the TrueView Ecosystem, hardware overview, flight planning, field operations, and field checking data.
TrueView Training Part 1 – Time Stamps
0:32 The GeoCue Ecosystem
2:33 3DIS/2DIS Post-Processing in TrueView EVO
3:46 Module Content
5:07 Training Objectives
5:38 TrueView 3DIS Hardware
5:41 TrueView 515/435
8:12 Specifications – TrueView 515/435
10:33 Specifications- TrueView 600 Series
12:26 Sensor Mounting
13:05 TrueView Integration
15:54 Installing TrueView
16:57 Controlling the System
18:00 CoreConfiguration.json Lever Arm Offset Change
19:22 CameraFileTranserWindDown
21:02 Laser Configuration
21:23 Battery Status
22:32 Proximity Mode
24:03 AutoDelete Feature
24:45 GNSS Light functionality
26:13 Field Operation- Before Flight
28:57 Heading Alignment Maneuver
30:39 Field Operation – After Landing
32:30 Cycle Recovery
33:02 Image Write Time & Data Formatting
33:48 Basics of Planning a TrueView LIDAR Mission
44:45 What About the Cameras?
45:23 Line Spacing
46:34 Flying height
47:16 Scan Angle
48:03 Side Overlap
52:03 Data Holidays
54:12 Recommended Approach
54:37 Look-Up Tables
55:20 Point Density
55:58 TrueView Mission Planning Spreadsheets
58:03 Helpful Formulas
58:10 Some Common Settings
58:53 Prevent Heading Drift
1:01:14 Heading Error Example: APX-15 vs APX-20
1:02:44 Using Litchi Hub
1:14:15 Flight Operations
1:14:41 Base Station Requirements
1:22:52 Check Points
1:25:20 Mission Checklist
1:25:57 Field Checking Data