During our March TrueView Training event, we recorded the training session with the presenter to have the training material available on demand. Since the training covers two days of various topics we have broken the event down into smaller pieces. This session covers field checking data, import settings, guest sensors, and project creation and processing.
0:10 Field Data Checking Methods Post Flight
1:15 Cycle Logs
4:16 Image Count
6:14 True View Processing Workflow
8:00 True View Import Wizard Settings Page
9:18 Guest Sensors
10:34 Select Input Cycle Folder
11:36 Project Roots Folder
13:44 Cycle Info Page
14:50 Selecting Project Reference System
17:43 Base Station / Ancillary File Page
18:35 Base Station Antennae Height
19:03 Ancillary Files
19:46 Base Station Location Page
21:22 Load Opus Solution
24:43 Nail Manager Import
28:00 PP window PosPac Processing
32:54 Review PosPac Report
34:30 Create Flight lines.
39:13 Create TrueView Trajectories
40:20 Retain Photos Within Flight Lines
41:26 Update Photo EXIF Tags with True Pose® Information
41:44 Geocoding Flight Line Numbering Solutions
42:56 Create Trajectories
43:15 Geocode Lidar
45:55 Radial Measurement Visualization Example
50:05 User Interface Options
50:50 Profile & Draw Profile Line
52:42 LP360 Live View
54:40 Make Points Bigger
55:02 Setting Clip Range
57:43 Colorize Point Cloud
58:10 Draw 3D view Extent
1:01:38 Import 2nd Flight
1:03:50 Create Flight Lines for 2nd Flight
1:06:20 Geocode 2nd Flight
1:07:05 Active LAS Layer
1:09:10 TrueView Reckon Sign In
1:10:00 Job Manager
1:10:45 StripAlign for EVO
1:12:20 StripAlign Notification email
1:15:38 Metashape for EVO
1:25:50 QAQC
1:26:10 Import Checkpoints
1:30:33 Change Symbology Properties
1:31:23 Control Points Report
1:40:04 Export Report
1:41:35 Display by Intensity