When updated Geoid models are released by NGS, GeoCue is updated to reflect these changes. The previous geoids still exist within the program, they are however disabled. We do this because NGS states for example that, “When using the geoid models, please be advised that GEOID12B should supersede previous models GEOID12 and GEOID12A.” If there…
There may be times when a user needs to add a custom horizontal coordinate system to the program. This option can be done within GeoCue. Initial steps Generate a custom PRJ file to reflect the new custom coordinate system There are a couple of options how to accomplish this Copy a current PRJ file and…
While creating a new layer in a GeoCue project you may see a Missing Datum Transformation dialog appear. The missing datum transformation means that GeoCue does not have a predefined transformation path between the horizontal datum of the layer and the project’s horizontal datum, or the vertical datum’s defined horizontal datum. In most cases that we…
Macro Name – Must be unique once it has been assigned to a working segment, even if only changing a setting, as that is how one can track through the history to see what was assign and possibly run on data. Macro Description – Optional description about what the macro does. Category – A way…
Symptom: The GeoCue Client is slow to open and then you can’t close it and need to kill the process using Task Manager. Probable Solution: If there is a firewall in place it could possibly be blocking or slowing the connection between the GeoCue Server and Client. Please make sure the following programs are allowed through…
This technical note explains how users may view the work assigned to them via the project management tools within GeoCue. This is typically done when users are splitting up the manually intensive work, such as LIDAR classification QC, amongst many users. Read the complete article: CueTip – Viewing Work Assigned to Current User
While debugging issues with the GeoCue Server a dump of the server memory can sometimes lend some insight into the problem. To get the dump, download Microsoft’s ProcDump from https://technet.microsoft.com/en-us/sysinternals/dd996900.aspx Unzip it and as administrator (right-click on command prompt and open using “Run as Administrator”), run the following command procdump.exe -ma RepHostGUI This will create a file…
GeoCue Environment Builder allow users to modify or extend GeoCue Environments. The Symbology option within Environment Builder allows the user to specify different symbology (color, weight, style) for different entity types. The GeoCue Environment Builder User Guide provides additional information concerning changing symbology.
Control Points –points used in the survey –GNSS base station locations –used in vertical bias correction Check Points –should be independent –used for accuracy reporting –withheld from processing
ASPRS (American Society for Photogrammetry and Remote Sensing) LAS Specification defines the attributed that can be stored in each point data record format (0 through 10). The chart below provides a summary as to which attributes can be stored in which format. Attribute 0 1 2 3 4 5 6 7 8 9 10 X…