True View 410 Hardware Users Guide

The True View 410 Hardware Users Guide covers the ins and outs of installing and operating the GeoCue True View 410 3D Imaging System (LIDAR/Cameras). Applies to firmware v2.0.3 and later. Updated for v2.1.8.

Contents

About GeoCue Group, Inc. 4
About True View® 410. 5
A True View Cycle. 5
True View 410 Hardware Integration Kit. 6
Installing the Top Plate and Controller Box. 6
Installing the Ronin Mount. 10
True View 410 Installation. 12
True View 410 Battery. 16
True View 410 Universal Mass Storage (UMS). 17
System Configuration File (SCF). 17
Core Configuration File. 17
CCFSection6 – POS. 18
CCFSection8 – Camera. 18
CCFSection11 – Configuration Laser. 19
CCFSection15 – Battery. 20
CCFSection16 - Cycle. 20
CCFSection17 – Storage Auto Delete. 21
True View 410 Field Operations. 22
1.      Base Station. 22
2.      Pre-Flight. 23
3.      Controller Box LEDs. 25
4.      Heading Alignment Maneuver. 27
5.      After Landing. 28
True View EVO.. 29
Logging in To APX15. 30
Configure True View Wi-fi 30
Log in to APX-15. 31
Download T04 Files. 32
Measuring GNSS Lever Arm Offsets. 33
Z Offset. 34
X Offset. 35
Y Offset. 36
True View 410/M600 Pro – Mission Checklist. 37
FAQ.. 39
Support. 40
Share

AirGon Support

AirGon Support has written 175 articles

Leave a Reply