The True View 410 Hardware Users Guide covers the ins and outs of installing and operating the GeoCue True View 410 3D Imaging System (3DIS) (LIDAR/Cameras). Applies to firmware v3.0.7.1
Contents
About GeoCue Group, Inc. 4 About True View® 410 5 A True View Cycle 5 True View Hardware Integration Kit (M600) 6 Installing the Top Plate and Controller Box 6 Installing the Ronin Mount 10 True View Hardware Integration Kit (M300) 12 Installing the Controller Plate, Antenna Mast Base 12 Installing M300 True View Mounting Bracket 14 True View 3DIS Installation 17 True View Battery 21 True View Data Storage Devices 22 UMS 22 Camera SD Cards 22 System Configuration File (SCF) 22 Core Configuration File (CCF) 23 CCFSection6 – POS 23 CCFSection8 – Camera 24 CCFSection11 – Configuration Laser 25 CCFSection15 – Battery 26 CCFSection16 - Cycle 26 CCFSection17 – Storage Auto Delete 27 True View 410 Field Operations 29 1. Base Station 29 2. Pre-Flight 30 3. Disable Obstacle Avoidance 32 4. Center of Gravity (GC) Calibration 32 5. Controller Box LEDs 33 6. Heading Alignment Maneuver 36 7. After Landing 37 True View EVO 38 Logging in To APX15 39 Configure True View Wi-fi 39 Log in to APX-15 40 Download T04 Files 41 Measuring GNSS Lever Arm Offsets 42 Z Offset 43 X Offset 44 Y Offset 45 True View 3DIS/M600 Pro – Mission Checklist 46 Hardware Maintenance 48 Dust Filter 48 FAQ 50 Support 51