Problem: When running a macro through TerraSlave from GeoCue, routines that depend upon trajectory information can fail to return any results. These routines include “Cut Overlap-Cut by Offset option” and “Apply Corrections”. Cause: When assigning and running a macro through TerraSlave from GeoCue, there is no setting to select which trajectory layer to use as…
If you choose to load backdrop images while editing in TerraScan (while through GeoCue’s Process in TerraScan, DirectDrive, or directly in MicroStation’s Raster Manager) and your images show up in the wrong place relative to your LAS points, MicroStation’s Raster Manager may be interpreting your TFW (sister file) or coordinates incorrectly. Raster Manager defaults the…
Problem: After updating GeoCue version and opening GeoCue client, the following error may occur: “Error Initializing Raster Manager: System.IO.FileLoadException: Could not load file of Assemply ‘gdal_csharp, Version…..” Solution: This indicates that the update failed to install the latest dll. Uninstall the client, manually ensure that all the relevant files are empty with exception of the…
When launching MicroStation from GeoCue and you have more than one version of on that machine, you can specify which version to use as a default. In your GeoCue session, go to Setup>Options>LIDAR 1 CuePac: Under the ‘Terrasolid’ tab, there is a drop down menu called ‘Bentley Applications’. Select the version of MicroStation you wish to…
About this Document Welcome to the GeoCue Project Dashboard User Guide. The reader of this document is expected to be familiar with the basic GeoCue processing system. For information on GeoCue itself, please refer to the GeoCue User Guide. Contents 1 Introduction 2 A General Overview of Project Dashboard 3 Viewer Role 3.1 Project View…
About this Document Welcome to the Frame CuePac User Guide. This guide provides background on using GeoCue to manage Leica Geosytems’ FramePro image processing software in a GeoCue managed workflow. This workflow may include from 1 to n nodes for FramePro processing. If you are using distributed processing, you may want to refer to the GeoCue Command Dispatch…
About this Document Welcome to the Federator User Guide. Contents 1 Introduction 2 Network Requirements & Considerations 2.1 “All Internal” Configuration 2.2 DMZ Configuration 3 Installation & Setup 3.1 Prerequisites 3.2 Installation 3.3 Federator Server Setup 3.3.1 Setup MSDE or local SQL Server 3.3.2 Setup Remote SQL Server 3.3.3 Continue After SQL Server Setup 3.4…
About this Document Welcome to the GeoCue Distributed Project Management System (DPMS) User Guide. The information in this guide assumes that you have an intimate knowledge of the core functions of GeoCue. Therefore, basic principals such as adding to the Working Set, selecting, Checklist processing and so forth are not covered in this guide. If…
About this Document Welcome to the DMC PPS CuePac User Guide. This guide provides background on using GeoCue to manage Intergraph’s Digital Mapping Camera (DMC) Post-Processing System (PPS) in a GeoCue managed workflow. This workflow may include from 1 to n nodes for PPS processing. If you are using distributed processing, you may want to refer…
When importing raw swath data into GeoCue with flight line numbers that range over 32767, a message could appear requiring a number between 1 and 32767 to be used in the Assign Strip Numbers settings. GeoCue is capable of numbering strips from 1 to 65535, but a change needs to be made in…